Installation and Commissioning of Electromechanical Equipment for Water Conservancy and Hydropower

The business of installing and commissioning mechanical and electrical equipment is currently the company's second largest business. A total of 13 hydropower stations have been installed and 7 hydropower stations have undergone automation transformation, efficiency enhancement, capacity expansion and multiple technical renovation, maintenance and testing projects.

Mechanical and electrical installation of hydropower stations: The installation and construction tasks of mechanical and electrical equipment for projects such as Wengxi Power Station in Taishun County, Zhejiang Province (1*1.6MW), Unit #3 of Dazhaihe Third-level Power Station in Jinping County, Yunnan Province (3*5MW), Fengchunling Third-level Power Station in Yuanyang County, Yunnan Province (2*6.3MW), Fengchunling First-level Power Station (2*6.6MW), Fengchunling Second-level Power Station (2*5MW), Yangxihe Second-level Power Station (2*6.5MW), Halonghe First-level Power Station (2*5MW), Datammen in Qingyuan, Zhejiang Province (2*2.5MW), Liangtou Power Station in Pingyang County (2*0.5MW), Mu Shutian Power Station (3*1MW), Gechangqiao Power Station (2*1MW + 0.8MW), Baishuiji Power Station (2*0.8MW), Dongningjing Hydropower Station in Xiangyuan County, Shanxi Province (2*0.4MW), etc.

Integrated automation transformation of hydropower stations: The integrated automation transformation of power stations such as Sanchaxi Power Station in Taishun (2*22MW), Sanchaxi Second-level Power Station (2*4MW), Dishan Power Station in Xinchang, Zhejiang (2*2MW), Dasai Power Station in Longquan (4*0.63MW + 1*1.25MW), Linjiang Power Station in Longquan (3*0.5MW), Shimen Power Station in Pingyang County (4*0.5 + 2*0.2MW), and Xianju Hydropower Station in Taishun County (2*12.5MW).

Electrical tests of hydropower stations: Electrical handover tests of power stations such as Tingminghe Power Station in Nujiang, Yunnan (2*20MW), Guanbei Power Station in Yangshan, Guangdong (2*3.2MW + 1.6MW), and Egahe Power Station in Nujiang (3*15MW); Previous electrical preventive tests of Hongxi Second-level Hydropower Station in Taishun (2*4MW) and Wengxi Hydropower Station in Taishun (1*1.6MW); Electrical preventive tests of Liangtou Power Station, Baishuiji Power Station, Mu Shutian Power Station, Jiaoxi Power Station, and Shimen Power Station in Pingyang County in 2022; Electrical preventive tests of Fengchunling First-level Power Station, Fengchunling Second-level Power Station, Fengchunling Third-level Power Station, Yangxihe Second-level Power Station, and Yangxihe Third-level Power Station in Yuanyang County, Yunnan Province in 2023.

Technical renovation projects of hydropower stations: Replacement, installation and commissioning of two governors, excitation systems and butterfly valves in Laowohe Fourth-level Hydropower Station of Shenneng Hydropower; Rectification and defect elimination of switch cabinets and cable trays, renovation of three excitation systems and three governors in Bajiaohe First and Second-level Hydropower Stations; Renovation of two excitation systems and two governors in Aluhe Hydropower Station; Renovation of three excitation systems in Latudi Hydropower Station; Replacement of three governors in Laowangzhuang Hydropower Station of Huaneng Lancangjiang; Replacement, installation and commissioning of two governors and two ball valve control cabinets in Fengdianhe Second-level Hydropower Station.

Overhaul projects of hydropower stations: Each unit A overhaul since 2020 in Laowohe Fourth-level Hydropower Station of Shenneng Western Nujiang Division; Five unit C overhauls in Dudukuluohe First and Second-level Hydropower Stations in 2023; Three unit C overhauls in Latudi Hydropower Station; Unit A overhauls of No. 2 and No. 4 units and unit C overhauls of No. 1 and No. 3 units in Zilenghe Hydropower Station; Two unit C overhauls in Gudanhe Hydropower Station; Unit A overhaul project of No. 2 unit in Bajiaohe First-level Hydropower Station in 2024; Mechanical and electrical equipment repair and replacement projects after the July 28th disaster in Husahe Third and Fourth-level Hydropower Stations in 2023 of Shenneng Western Dehong Division; Unit A overhaul project of No. 5 unit in the capacity expansion of the second phase of Binglangjiang.

The technical renovation project company has maintained good cooperative relations with Guangzhou Qingtian Industrial Co., Ltd., Wuhan Changjiang Control Equipment Research Institute Co., Ltd., Wuhan Sanlian Control Equipment Co., Ltd., Wuhan Water Treatment Valve Co., Ltd. and Hangzhou Guowang Technology Co., Ltd.

The specific items are listed in Table 2.

 

Table 2: List of Installation, Commissioning Projects of Mechanical and Electrical Equipment of Hangzhou Lvchuan Hydropower Technology Service Co., Ltd.

No.

Project Name

Installed Capacity, Type, Parameters

Completion Time

Type

Quality

Geographic

Position

1

Taishun Wengxi Hydropower Station

1×1.6MW, horizontal mixed-flow, head 160m, 10kV

2006.6

Installation

Excellent

Taishun, Zhejiang

2

Unit 3 of Dazhaihe Third-level Hydropower Station

1×5MW

Horizontal impulse, head 500m, 110kV

2009.9

Installation

Excellent

Jinping, Yunnan

3

Fengchunling Third-level Hydropower Station

2×6.3MW,horizontal mixed-flow, head 316m, 110kV

2011.1

Installation

Excellent

Yuanyang, Yunnan

4

Fengchunling First-level Hydropower Station

2*6.6 + 2*0.4MW, horizontal impulse + horizontal mixed-flow, head 345m + 90m, 110kV

2013.9

Installation

Excellent

Yuanyang, Yunnan

5

Fengchunling Second-level Hydropower Station

2×5MW, horizontal mixed-flow, head 185m, 110kV

2014.6

Installation

Excellent

Yuanyang, Yunnan

6

Yangxihe Second-level Hydropower Station

2*6.5MW, horizontal impulse, head 400m

2016.5

Installation

Excellent

Yuanyang, Yunnan

7

Halonghe First-level Hydropower Station

2×2.5MW

Horizontal impulse,head 316m

2016.5

Installation

Excellent

Honghe, Yunnan

8

Datammen Hydropower Station

2×2.5MW

Horizontal impulse,head 230m

2017.1

Installation

Excellent

Qingyuan, Zhejiang

9

Liangtou Hydropower Station

2×0.5MW

Horizontal impulse,head 230m

2017.9

Installation

Excellent

Pingyang, Zhejiang

10

Baishuiji Hydropower Station

2×0.8MW

Horizontal mixed-flow, head 130m

2019.7

Installation

Excellent

Pingyang, Zhejiang

11

Gechangqiao Hydropower Station

2×1.0+0.8MW

Horizontal mixed-flow, head 103m

2019.6

Installation

Excellent

Pingyang, Zhejiang

12

Mushutian Hydropower Station

2×0.5MW

Horizontal mixed-flow, head 100m

2019.5

Installation

Excellent

Pingyang, Zhejiang

13

Dongningjing Hydropower Station

2×0.4MW

Horizontal mixed-flow, head 20m

2018.9

Installation

Excellent

Xiangyuan, Shanxi

14

Sanchaxi Hydropower Station

2×22MW, vertical mixed-flow, head 160m, 110kV

2012.1

Integrated Automation Transformation

Excellent

Taishun, Zhejiang

15

Shimen Hydropower Station

4×0.5 + 2*0.2MW, horizontal impulse, 35kV

2018.5

Integrated Automation Transformation

Excellent

Pingyang, Zhejiang

16

Dasai Hydropower Station

4×0.63 + 1.25MW, horizontal mixed-flow, 35kV

2019.5

Integrated Automation Transformation

Excellent

Longquan, Zhejiang

17

Linjiang Hydropower Station

3×0.5MW, vertical axial-flow, 10kV

March 2020

Integrated Automation Transformation

Excellent

Longquan, Zhejiang

18

Dishan Hydropower Station

2×2MW, vertical axial-flow, 35kV

2020.4

Integrated Automation Transformation

Excellent

Longquan, Zhejiang

19

Sanchaxi Second-level Hydropower Station

2×4MW, vertical mixed-flow, head 27.12m, 110kV

2022.1

Integrated Automation Transformation

Excellent

Taishun, Zhejiang

20

Xianju Hydropower Station

2×12.5MW, vertical mixed-flow, head 110m, 110kV

2024.1

Integrated Automation Transformation

Excellent

Taishun, Zhejiang

21

Sanchaxi Second-level Hydropower Station

2×4MW, vertical mixed-flow, head 27.12m, 110kV

2009

Pre-test

Excellent

Taishun, Zhejiang

22

Hongxi Second-level Hydropower Station

2×4MW

Horizontal mixed-flow, 110kV

2013, 2016, 2020, 2024

Pre-test

Excellent

Taishun, Zhejiang

23

Taishun Wengxi Hydropower Station

2*0.5MW + 1×1.6MW, horizontal impulse + horizontal mixed-flow, 10kV

2013, 2016,

Pre-test

Excellent

Taishun, Zhejiang

24

Pengxishui Hydropower Station

2×0.5MW

Horizontal mixed-flow, 35kV

2016

Pre-test

Excellent

Taishun, Zhejiang

25

Tingminghe Hydropower Station

2×20MW, vertical impulse, 110kV

2015.5

Handover Test

Excellent

Lushui, Yunnan

26

Egahe Hydropower Station

3×15MW, vertical impulse, 110kV

May 2020

Handover Test

Excellent

Lushui, Yunnan

27

Guanbei Hydropower Station

2×3.2+1*1.6MW

Horizontal mixed-flow, head 230m

2019.7

Handover Test

Excellent

Yangshan, Guangdong

28

Unit #2, #4 Overhaul and Unit #1, #3 C-Overhaul of Zilenghe Hydropower Station

4×6MW

Horizontal impulse,head 600m

2024.4

Overhaul

Excellent

Fugong, Yunnan

29

Unit #1, #2, #3 C-Overhaul of Latudi Hydropower Station

3×6.3MW

Horizontal impulse,head 500m

2024.4

Overhaul

Excellent

Fugong, Yunnan

30

Unit #1, #2 C-Overhaul of Gudanhe Hydropower Station

2×12.5MW

Vertical impulse, head 500m

2024.4

Overhaul

Excellent

Fugong, Yunnan

31

Unit #1, #2 C-Overhaul of Dudukuluohe First-level Hydropower Station

2×15MW

Vertical impulse, head 500m

2024.4

Overhaul

Excellent

Lushui, Yunnan

32

Unit #1, #2, #3 C-Overhaul of Dudukuluohe Second-level Hydropower Station

3×20MW

Vertical impulse, head 600m

2024.4

Overhaul

Excellent

Lushui, Yunnan

33

Unit #1, #2 A-Overhaul of Laowohe Fourth-level Hydropower Station

2×12.5MW

Vertical mixed-flow, head 175m

2021.6、2024.6

Overhaul

Excellent

Lushui, Yunnan

34

Unit #2 A-Overhaul of Bajiaohe First-level Power Station

3×5MW

Horizontal impulse,head 500m

May 2024

Overhaul

Excellent

Lushui, Yunnan

35

Transformation of Governor and Butterfly Valve Oil Pressure Device of Sanchaxi Second-level Hydropower Station

2×4MW, vertical mixed-flow, head 27.12m, 110kV

2018.10

Technical renovation

Excellent

Taishun, Zhejiang

36

Transformation of 2 Governors, Butterfly Valves and Excitation Systems of Laowohe Fourth-level Hydropower Station

2×12.5MW

Vertical mixed-flow, head 175m

2022.12-2024.4

Technical renovation

Excellent

Lushui, Yunnan

37

Transformation of 2 Governors of Xianju Hydropower Station

2×12.5MW, vertical mixed-flow, head 110m, 110kV

2024.1

Technical renovation

Excellent

Taishun, Zhejiang

38

Transformation of 3 Governors of Laowangzhuang Hydropower Station

3×3.2MW, horizontal mixed-flow, 110kV

2024.4

Technical renovation

Excellent

Lanping, Yunnan

39

Transformation of No. 1, No. 2 Governors and Butterfly Valve Oil Pressure Device of Fengdianhe Second-level Hydropower Station

3×3.2MW, horizontal impulse, 110kV

May 2024

Technical renovation

Excellent

Lanping, Yunnan

40

Transformation of 3 Governors of Bajiaohe Second-level Power Station

3×5MW

Horizontal impulse,head 500m

November 2024

Technical renovation

Excellent

Lushui, Yunnan